Port of Astoria v. Hodel – BPA was required to prepare an Environmental Impact Statement before deciding to build a new transmission line and enter into a power sales contract with an aluminum smelter. The EIS would need to address these actions in relation to BPA’s proposed Hydro-Thermal Power Program. This suit and several others gave rise to the Northwest Power Act.